Skip to content
STRATEGY + DESIGN + TECHNOLOGY
POSITIVE ORDER PANELFROM SALE TO DELIVERY. AN INTERCONNECTED OPERATION.

ORDER MANAGEMENT SYSTEM THAT WE DEVELOPED.

EVERY STEP OF THE SALE.
ONE CONTROL CENTRE.

Start with one product. Manage your projects, orders and team in the same center. From catalog to cargo, from customer history to daily report; Let the rest of your work remain in the same record.

01 / STARTSALES PAGE

Order form linked to your project.

02 / CATALOGPRODUCT & PACKAGE

Price, stock and physical content.

03 / REGISTRATIONNEW ORDER

Product, customer and delivery information.

AT THE CENTER OF THE OPERATION.
EVERYTHING
TO EACH OTHER
DEPENDENT.
ORDER RECEIVED.
TEAMTask, note and action history.
CARGOQuote, tag and track.
OVERVIEWMap, statuses and reports.
CUSTOMEROrder history and tracking link.
THE STORY CONTINUES AFTER ORDERING.

Successful order registration becomes the starting point of the same operation.

01 / ORDER OPERATIONCORRECT RECORDING. RIGHT STEP. VISIBLE PAST.

THE ORDER HAS ARRIVED.
NOW IT'S TURN IN ORDER.

Locating the order, confirming the information, recording the team's transaction. The Positive Order Panel brings these parts of the daily operation together around the same record.

SEARCH / FILTER / LIST PREFERENCE

RECORDS ARE INCREASING.
DO NOT MAKE SEARCH DIFFICULT.

Narrow your search.

Search by order number, customer, phone or city. Use the start–end date and status filter together.

EDIT THE LIST TO YOURSELF.

Sort by date, name, amount or city. Your choice of 20, 50 or 100 records per page is saved to the user.

OPEN THE RESULT.

Apply it with “Update list” and go to detail from registration. “Clear” resets the filters; It does not delete orders.

02 / PRODUCT & PACKAGE CATALOGUEFROM PRICE TO PHYSICAL CONTENT. SAME ORDER.

ONE PACK.
MULTIPLE PRODUCTS.

The package quantity in the order and the number of physical products in the package are different fields. Manage the catalogue, price and shipping information while maintaining this distinction.

LET'S SEE THE LOGIC OF PERIOD TOGETHER.
QTY IN PACKAGE
ORDER QUANTITY
3QTY IN PACKAGE2ORDER QUANTITY6PHYSICAL PRODUCT

ORDER 2 PACKS OF 3 = 6 PHYSICAL PRODUCTS.This is an example of custom. Read the package price, order line and quantities in Excel with this distinction.

01 / IDENTITY

EVERY PACKAGE
THERE IS A DEFINITION.

Save the SKU, product name, tagline, and image path. Edit the package; Disable it when removing it from sale, re-enable it when necessary.

02 / PRICE & STOCK

WITH THE PRICE
ALSO SEE THE COST.

Manage the selling price, old price if any, total cost of this package and inventory. The package cost affects the gross profit calculation.

03 / DISPATCH INFORMATION

SUITABLE FOR CONTENT
A CARGO DATA.

Enter the weight in grams and the dimensions in centimeters. It is calculated from desi measurements; In the cargo offer, volumetric value and actual weight are evaluated together.

BEHIND THE SAME ORDER.

TOO THE CUSTOMER
SEE IT ALL.

NAME, PHONE, EMAIL.

Call the customer; Refine the records of the selected project with the city map and blacklist filter.

WITH ITS PAST.

Open previous orders. Sort by last order, name, number of orders or amount.

THE REASON IS ON RECORD.

Record the reason for blacklisting. Deleting a customer in the main account does not remove existing orders and order history. Blacklist removal does not automatically restore old order statuses.

SALES PROJECTS & CONNECTIONSSAME PANEL. PROTECTED PROJECT CONTEXT.

SEPARATE PROJECTS.
SAME CENTER.

Each sales area has its own identity, team and measurement settings. You carry this context with you as you move between projects in the Positive Order Panel.

SAMPLE PROJECT SCHEDULES
project01.example↗
EXAMPLE SALES AREA / 01SINGLE PRODUCT
Form → order step↗
Reads the settings of the project it is linked to.
PROJECT ID01
PROJECT NAMEPROJECT 01
PROJECT CODEPROJE_01
DOMAIN NAMEPROJE01.EXAMPLE
AUTHORIZED SOURCEHTTPS://PROJE01.EXAMPLE
DESIGNED ACCESSOPERATIONS TEAM
ACTIVE

Project context, team access, and release status are maintained together.

BELONGS TO THE PROJECTMEASUREMENT SETTINGS.
Meta Pixel IDProject 01
GA4Project 01
GTMProject 01
Google AdsProject 01
TikTokProject 01

Measurement IDs are managed in the relevant project record.

THE START OF MEASUREMENT.

NOT WHEN THE FORM IS OPENED.
WHEN THE ORDER IS SAVED.

01The form opensThe order is saved successfullypurchase event

Order acceptance stops in the archived project; No new purchasing event occurs.

Pixel event and ad conversion attribution are evaluated separately. Permissions, browser blocks, and ad platform matching rules may affect the result.

GELIVER & CUSTOMER TRACKINGYOUR PACKAGE. YOUR ORDER. SAME RECORDING.

FROM PACKAGE TO DOOR.
SAME RECORDING
CONTINUE.

From your project's shipping link to the customer's tracking screen; The offer, label and shipment stages proceed according to the same order.

CARRIER: PREPARING

ORDER: GETTING READY.

Package information, selected offer and label are tracked on the same order.

01 / CONNECTION

PROJECT SPECIFIC API.

Connect the API key of your Geliver account to the relevant project; Proceed by verifying the connection.

02 / ENVIRONMENT

TEST AND LIVE SEPARATE.

Do the experiment in a test environment. Work with the correct live link in the actual post.

03 / PACKAGE INFORMATION

FROM SIZE TO LABEL.

Complete package dimensions and weight. Proceed from order with appropriate quote and tag action.

WITHOUT OPENING A PANEL ACCOUNT.

When the form is completed, the customer tracks his order and shipping stages with the personalized link generated. When the actual shipment occurs, it also reaches the carrier's tracking page from here.

PERSONALIZED.
DEPENDING ON THE ORDER.

Shipping stages depend on carrier data. Return and delay signals are evaluated separately. Visual flow is an example fiction that describes the product.

TEAM, ACCESS AND ACCOUNT CONTROLSAME CENTER. DEFINED RESPONSIBILITIES.

SAME TEAM.
CLEAR POWERS.

Seeing a project, performing a transaction and accessing financial data are different authorizations. Determine who will work where and what actions they will perform according to their duties.

Management role of the customer workspace. Access is evaluated along with assigned projects and customizable authorization profile.

EXPAND YOUR TEAM WITH THE SAME ACCOUNT.

The main account can create users directly or Single-use invitation valid for 48 hours can send. The invited person sets his own password; An existing user can be added to a new project without creating a new account.

TWO-STAGE ENTRY.

Add an additional verification step to your account with compatible authenticator apps and recovery codes. For some roles, this protection is mandatory.

SESSIONS ARE AT YOUR HANDS.

Examine open devices, log out when necessary. When the password is changed, sessions outside of this device are terminated.

MAINTAIN THE APPEARANCE.

Eye button hides financial amounts. Optional four-digit PIN prompts for verification when replaying; PIN verification is valid for five minutes.

Hiding the view and financial access authorization are separate controls.

LET IT FIT YOUR WORKING WAY.

Choose light, dark or system view. The theme is remembered on the device, the accent color is remembered in your account; status colors and yellow brand accent are retained.

THE ROLE IS A START. AUTHORITY PROFILE CAN BE CUSTOMIZED.The protected accesses of the platform administrator cannot be changed by standard users.
ANALYSIS / REPORT / DAY CLOSINGSAME PROJECT. A CLEAR VIEW.

EVERY ORDER.
A CLEARER VIEW.

Evaluate your orders, the movement on your site and the day's report in the same working order. Let the date, situation and project context be the beginning of every interpretation.

SELECT THE PERIOD. CLARIFY THE VIEW.

OF THE OPERATION
THE SITUATION REFLECTED IN THE NUMBERS.

Select date range and order status. Evaluate order, turnover, average basket, gross profit, repeat risk and product performance together.

  • Payment method, city and state distributions
  • Excel output prepared with the same date and status
  • Comparable view in project context

Blacklist, cancellation, return and trash records are excluded from turnover. Gross profit is based on product cost; It is not net profit after all operating expenses have been deducted.

UNDERSTANDING MEASUREMENT STARTS WITH READING THE APPEARANCE.
SUMMARY OF THE DAY

LOOK AT THE DAY FROM THE SAME TABLE.

Today/yesterday turnover comparison, new customers, views, sales conversion rate and the “best seller in net turnover” package are tracked in the context of the project in the Overview. Audio and quick access tools are in the top bar.

FROM MAP TO ORDER

SELECT THE CITY. ACCESS THE RECORDS.

On the live Türkiye map, select the Today, Last 7 Days, This Month or All time period. Tap a city to open that city's corresponding order list.

DAILY USE / SMALL DETAILSONGOING SIDE OF THE OPERATION.

GREAT STREAM,
CARRIES SMALL DETAILS.

The response to a request, the trace of a change, the status of a connection. Areas that complete daily use are on the same panel.

01 / SUPPORT

THE SPEECH IS ON THE SAME DEMAND.

Track unread, open, answered and resolved requests. Replies and attachments remain in the same conversation within the context of the respective project.

MAXIMUM 5 ATTACHMENTS / JPG · PNG · WEBP · PDF
02 / TRANSACTION HISTORY

THERE IS A TRACE OF CHANGE.

Read time, user, event and related record together. Associate the status movements of the order with its own “Order flow”.

WHO / WHEN / WHICH RECORDING
03 / SYSTEM HEALTH

SEE COMPONENTS SEPARATELY.

Examine database, cache, scheduler, storage, push notification, and Geliver controls. Read the control time and status; “configured” does not mean a live connection has been established.

CONFIGURATION / CONNECTION / CONTROL
04 / BANK ACCOUNTS

PAYMENT INFORMATION IS REGULAR.

Manage bank, account holder and IBAN information. Bank registration does not mean that the transfer is open in every sales form; Payment options depend on the project.

REGISTERED ACCOUNT / AFFILIATE FORM FLOW
05 / MOBILE PANEL

INDEPENDENT FROM THE DESK.
SAME WORKING ORDER.

Access basic areas from the bottom navigation, all sections and project selection from the menu. See other columns of large tables by scrolling horizontally.

+ CHECK THE PROJECT AND WHAT'S AWAITING AS YOU START THE DAY.WATCH SHIPPING AND RETURN SIGNS, SUPPORT REQUESTS AND REPORT FLOW AS YOU CLOSE THE DAY.
PLANS & PRICESPOSITIVE ORDER PANEL

A MORE ORDERED OPERATION TOGETHER.

ONE PANEL.
A CLEAR PLAN.

Moreover, only 1,000 TL per month + 0.5% commission. Let's evaluate your sales and operations needs together.

POSITIVE ORDER PANEL ONE PLAN

Moreover, it is ONLY MONTHLY

1.000TLMONTHLY
%0,5COMMISSION
LET'S TALK ABOUT YOUR BUSINESS. LET'S PLAN TOGETHER.FROM PRODUCT TO ORDER. FROM ORDER TO OPERATION.

BEFORE YOU START.

YOUR QUESTIONS.
ANSWERED.

Let's clarify the scope of the panel, the meaning of the data and the installation needs together.Let's talk about your needs
01Can we work with more than one sales project?

The panel handles multiple projects in the same workspace. Order, customer and report screens are evaluated in the context of the active project; Each user works with the project scope defined for him/her. For an invisible record, it is necessary to first check the project, date and status selection.

02Does gross profit mean net profit?

No. Gross profit is based on product cost; It is not net profit after all operating expenses have been deducted. The fact that the cost field is empty or zero does not indicate that the cost has not been incurred. We clarify cost definitions, report and Excel fields along with the version used and scope of access.

03Does a pixel event show the ad result?

Receiving the event and the advertising platform's conversion attribution are different. Project identity, permissions, browser blocks, and platform matching rules may affect the outcome. The panel does not provide ad spend reporting; It is necessary to examine the event record and the result on the advertising platform separately.

04Under what conditions does the 23:50 daily email work?

At 23:50 Türkiye time, orders of the last 24 hours are prepared in a single e-mail for active projects that the active user can access. Streaming depends on the scheduler and email service running on the server. Financial summary varies by authority; Collection and line amounts required for the operation can be found in the file.

05How do we determine the scope of the installation?

We examine your sales project, form flow, product and package structure, user needs and existing connections together. In this context, we clarify the panel version, features to be used, payment options and integration requirements. Work specific to your needs is also planned.

POSITIVE ORDER PANELPRODUCT / ORDER / OPERATION

WHEN YOUR BUSINESS IS GROWING.
LET YOU STAY IN CONTROL.

Let's evaluate your sales project and operation together. Let's plan the working order that suits your needs.

Let's talk about this systemExplore the panelOpens the current panel entry in a new tab.